wholesale distributor you need to call. [/spin] For a quarter of a century Encon has stocked thousands of gate operator, commercial door operator and access control products from 60 vendors . Encon also provides the most experienced technical representatives in the access control industry. [/spin]
automated gate operator is easy if you follow the proper installation guidelines . Maintaining and troubleshooting the gate operator system are equally important . Residents are satisfied when the installation is complete and functioning properly , but what happens when the system breaks down ? Residents expect their gate problems to be solved without delay . If you use proper equipment and correct installation techniques , you will be able to recognize and decipher most problems fast and effectively. [/spin]
device must have when troubleshooting gate operator systems . A quality meter measures both AC and DC, minimum and maximum voltage, ohms and continuity, capacitance and AC/DC amperage draw. Expect to pay approximately $150 for a meter with all of these essential specifications .
Power related issues commonly cause gate operator problems . Most gate operators have both a primary (high) and secondary (low) voltage. The primary is generally used to power the electric motor and the secondary typically powers the additional equipment such as card readers and telephone entry systems. Usually the primary is 115VAC and the secondary or outgoing voltage is 24VAC or VDC. However, more and more gate operators are being designed as low voltage. They have an incoming and secondary voltage of 12/24 AC/DC. Voltages are extremely important with low voltage operators. will show these voltages to a decimal point.| A high end multi-meter can provide the voltage amount to a decimal point.[/spin]
The first step when troubleshooting an operator is [spin} determining | deciphering | testing | accessing [/spin] whether its a high or low voltage problem. If there does not appear to be any primary power , double check the circuit breaker. Turn on the operator; then measure the voltage. An accurate voltage inspection is only obtained while the operator is under load while the operator is running, . Next Set the meter to its Min/Max setting. The purpose of doing this is to ensure the meter will keep the highest and lowest voltages [spin] that occur during the cycle. [/spin] If there is a considerable drop in voltage, [spin] this needs to be corrected before advancing to the next step.
When checking for secondary power, first ensure the meter is set properly. Some gate openers require a 12/24 VAC secondary while some gate operators use 12/24 VDC. If the operator is VDC, observe polarity. The positive terminal is posted on the red meter leg and the negative is on the black meter leg. . If there is no voltage reading , check the fuse(s).