Encon Electronics Troubleshoots Gate Operators

access control distributor you need to call. [/spin] For 26 years, Encon has offered thousands of gate operator, commercial door operator and access control products from 60 manufacturers . With 10 technical representatives, Encon has the most experienced technical representatives in the access control industry. [/spin]

automated gate operator is easy if you follow the proper installation guidelines . Maintaining and troubleshooting the perimeter access system are just as critical . Customers are content when the installation is complete and functioning properly , but what happens when the system breaks down ? Residents assume the malfunction to be solved instantly . If you install the equipment correctly and put the right products in for the job , you will be able to recognize and decipher most problems fast and effectively. [/spin]

gate opener installer should always have available when going to a site to troubleshoot a gate operator install . A quality meter measures both AC and DC, minimum and maximum voltage, ohm’s and continuity, capacitance and AC/DC amperage draw. Expect to pay approximately $150 for a meter with all of these critical features .

Power related issues are the root of many gate operator problems . Most gate operators have both a primary (high) and secondary (low) voltage. In general, the primary is expected to generate power for the gate operator and the secondary is used to power up accessories . Usually the primary is 115VAC and the secondary or outgoing voltage is 24VAC or VDC. However an increasing number of operators are completely low voltage. These gate openers have an incoming and secondary voltage of 12/24 AC/DC. These voltages are crucial. will show these voltages to a decimal point.| A high end multi-meter can provide the voltage amount to a decimal point.[/spin]

The first step when troubleshooting an operator is [spin} determining | deciphering | testing | accessing [/spin] whether it’s a high or low voltage problem. If there does not appear to be any primary power , research the on/off switch. Do not measure the voltage while the operator is static. A proper voltage check is only obtained while the operator is under “load” with the operator on . Next Position the meter to its Min/Max setting. The purpose of doing this is to ensure the meter will keep the highest and lowest voltages [spin] that occur during the cycle. [/spin] If there is a this should be resolved before continuing.

When checking for secondary power, first make sure the meter is set properly. Some gate openers use a 12/24 VAC secondary while others use 12/24 VDC. If the gate operator is VDC, observe polarity. The red meter leg goes on the positive terminal and the black meter leg on the negative terminal.. If there is no voltage , check the fuse(s).

Comments are closed.